FACILITY MANAGEMENT AND AMC

Facility management, AMC and O&M

Annual maintenance contracts across IT, electrical, ELV and HVAC, plus facility operations and technical support.

RAHCore delivery roleDesign planning · specialist coordination · project management · commissioning · lifecycle support
Facility management and AMC technical infographic.
ENGINEERING VIEW

The period after handover is longer than the project. It is contracted for deliberately.

Most of an installation's life is spent being operated, not being built. Yet maintenance is routinely the least specified part of a tender, agreed after the capital decision and priced against an unclear scope.

RAHCore contracts maintenance across IT, electrical, ELV and HVAC systems, with the scope, intervals and response model defined.

TECHNICAL SCOPE

What sits inside this capability

  • Annual maintenance contracts
  • Operations
REQUIREMENT

The requirement this addresses

Where maintenance is split by system, the client holds the coordination risk permanently: four contracts, four response models, four sets of records, and an argument about ownership every time a fault crosses a boundary between them.

DELIVERY

How RAHCore approaches it

We contract the systems together where the client wants that, against one plan, one reporting format and one escalation route. Preventive work runs to a schedule; corrective work runs to an agreed response; both are reported.

DELIVERY METHOD

From planning to commissioning

  1. 01Asset register and condition baseline at contract start
  2. 02Maintenance plan with intervals defined per system
  3. 03Scheduled preventive inspection and servicing
  4. 04Corrective response against an agreed model
  5. 05Periodic reporting on condition, incidents and consumption
  6. 06Plan revision based on what the reporting shows
SYSTEM VISUALS
Facility management and AMC technical equipment visual.
DETAILED CAPABILITY

Scope of work

Annual maintenance contracts

  • IT AMC
  • Electrical AMC
  • ELV AMC
  • HVAC O&M, AMC-focused
  • Facility technical support

Operations

  • Facility management and operations
  • Technical manpower support
  • Preventive maintenance
  • Corrective support
  • Lifecycle infrastructure support
  • Managed services
INTEGRATION

Integration with other systems

Where RAHCore led the delivery, the maintenance contract starts from a known asset register and coordinated design baseline. Where we did not, the engagement begins with a survey to establish that baseline before commitments are made about it.

LIFECYCLE

Lifecycle and maintenance

This is the lifecycle stage. The measure of it is whether the estate is in better condition at the end of the contract period than at the start, which is why condition reporting matters more than ticket volume.

TYPICAL ENGAGEMENTS

Where this capability is applied

  • IT AMC across an office or campus estate
  • Electrical and ELV maintenance under one contract
  • HVAC O&M for a building or data centre
  • Facility operations with technical manpower on site
  • Preventive maintenance programme for critical systems
  • Takeover of an estate installed by another contractor
WHY RAHCORE

What the delivery model adds

Systems maintained under one contractOne plan, one reporting format, one escalation route.
Condition reported, not just tickets closedThe measure is the state of the estate, not the volume of activity.
Baseline established before commitmentA survey precedes any undertaking about an estate we did not install.
DEFINE THE REQUIREMENT

Discuss a facility management and amc requirement with the coordination team.

Request a consultation